(6 desde 35 usuarios)

1h 55m 1970 HD

en Pelisplus. Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

  • Género:
  • País:
  • Director:
  • Actores:
 (1970)
Watch now
Tags:   # 1970   # Pelisplus   # Pelisplus 3   # películas   # pelicula completa   # online español   # online latino   # gratis   # online en español latino   # película completa online    

Comentario

User

Relacionados